Major Business

Architecture/Development

Despite continued challenges in the domestic construction market due to complex factors such as prolonged high interest rates and inflation, contraction in private investment, rising construction costs, and supply chain instability, HL D&I Halla continues to strengthen its differentiated competitiveness by applying the latest construction methods and advanced technologies to a diverse range of architectural assets, including commercial, logistics, and leisure facilities. Centered on EFETE, the new residential brand launched in 2025, the Company provides high-quality residential spaces while responding flexibly to market changes by concentrating its capabilities on redevelopment, reconstruction, and large-scale planning and proposal-based projects.

Core Competitiveness of the Architecture/Development Business

  • Integrated design and construction capabilities that balance spatial functionality and aesthetics
  • Differentiated residential value propositions based on the EFETE brand, Capabilities to execute redevelopment, reconstruction, and planning and proposal-based projects

Major Projects in 2025

1. EFETE Eunpa Lake View, Jigok District, Gunsan

  • Location332-1, Jigok-dong, Gunsan-si, Jeonbuk Special Self-Governing Province, and surrounding areas
  • Construction PeriodJune 2023–December 2025 (30 months)
  • Building ScaleFour buildings with two basement levels and up to 29 floors, including Top-floor Attic (291 households)
  • Site Area15,403㎡

2. Haeundae Halla Vivaldi Pentville

  • Location642-1, U-dong, Haeundae-gu, Busan, and surrounding areas
  • Construction PeriodJune 2022–December 2025 (43 months)
  • Building ScaleTwo buildings with five basement levels and 35 above-ground floors (122 officetel units)
  • Site Area1,555㎡

3. EFETE Jakjeon, Incheon

  • Location286-2, Jakjeon-dong, Gyeyang-gu, Incheon, and surrounding areas
  • Construction PeriodSeptember 2022–October 2025, including demolition (38 months)
  • Building ScaleFour buildings with two basement levels and 29 above-ground floors (340 households)
  • Site Area13,004.6㎡

4. EFETE Sincheon Station

  • Location83-6, Sincheon-dong, Siheung-si, Gyeonggi-do, and surrounding areas
  • Construction PeriodDecember 2021–September 2025 (46 months)
  • Building ScaleSix buildings with three basement levels and up to 47 above-ground floors (1,297 households)
  • Site Area37,413㎡

Infrastructure

The infrastructure business is closely linked to government fiscal operations and national development plans and is characterized by relatively low economic volatility and stable, sustained demand compared with other businesses. Based on its extensive construction experience and track record in the infrastructure sector, HL D&I Halla has established strong competitiveness. The Company maintains an integrated project execution system encompassing the full process from design and construction to maintenance across national infrastructure, including roads, ports, railways, airports, and bridges. It promotes sustainable infrastructure development by considering both public interest and commercial viability. In addition, by strengthening port and logistics operations through its subsidiaries, the Company is evolving beyond a construction-centered business structure toward a complex business model that generates stable long-term earnings.

Core Competitiveness of the Infrastructure Business

  • Extensive track record in ports, railways, airports, and expressways
  • Technical expertise and integrated capabilities covering design, construction, and maintenance Diversification of the earnings structure through linkage with operating businesses

Major Projects in 2025

1. Songsan Green City Pedestrian Bridge

  • LocationSaesol-dong, Hwaseong-si, Gyeonggi-do–Sadong, Ansan-si, Gyeonggi-do, and surrounding areas
  • Ordering PartyKorea Water Resources Corporation
  • Construction PeriodJuly 2022–May 2026
  • Construction DetailsPedestrian Bridge: L = 254 m, B = 6.5–16.5 m; an access road and associated landscaping works

2. Wondang–Taeri Regional Road

  • LocationWondang-dong, Seo-gu, Incheon–Nooji-dong, Gyeyang-gu, Incheon, and surrounding areas
  • Ordering PartyGeomdan Regional Headquarters, Korea Land & Housing Corporation
  • Construction PeriodJuly 2021–November 2025
  • Construction DetailsTotal length: 3.59 km, including earthworks, five bridges, and an underpass

3. Korea Coast Guard Western Maintenance Depot

  • LocationMokpo NewPort, Dal-dong, Mokpo-si, Jeollanam-do, and surrounding areas
  • Ordering PartyKorea Coast Guard
  • Construction PeriodDecember 2022–October 2025
  • Construction DetailsSite development: 72,677 m²; quay wall: 680 m; floating dock, shiplift, main building, accommodation building, commercial facilities, oil storage facility, etc.

4. Gyeongbu–Dongtan Straightening Project, Section 2

  • LocationCheonggye-dong, Hwaseong-si, Gyeonggi-do, and surrounding areas
  • Ordering PartyGyeonggi Regional Headquarters, Korea Land & Housing Corporation
  • Construction PeriodDecember 2016–March 2026
  • Construction DetailsUnderpass: 0.64 km; residential site development; central passenger passageway at Dongtan Station, etc.

New Business Direction of HL D&I Halla

To minimize risks arising from fluctuations in the construction market and secure a foundation for sustainable growth, HL D&I Halla is actively diversifying its business portfolio beyond the traditional construction-centered business structure. The Company is strengthening its port and logistics operating businesses through its subsidiaries to establish a complex business model capable of generating stable, long-term operating income. At the same time, it is securing new sources of earnings through selective investments in construction-related sectors and promising companies expected to achieve future growth. Through these efforts, HL D&I Halla will establish a resilient business foundation that remains stable despite construction market volatility and evolve into a company that creates sustainable value together with its shareholders and stakeholders.

HL D&I Halla’s New Business Promotion Framework

E

자연 환경과 공존하는 현장

  • 침수·배수 관리: 폭우 시 주변 농지·도로 침수 대응 및 체계적 배수 관리 운영
  • 조경 면적 확보: 전체 대지의 30% 수준인 4,646m² 조경 및 녹지 면적 확대를 통한 생태환경 개선
  • 공법 최적화: PRS공법 적용을 통해 자재 낭비 및 현장 폐기물 발생 최소화
4,646㎡ 조경 면적 확보 녹지환경 조성
S

안전·지역사회와 함께하는 현장

  • 자율적 안전 강화: 법적 기준(안전관리자 1인) 초과 — 위험 구간 추가 배치로 예방적 안전관리 실현
  • 통학로 안전관리: 인접 학교 통학로 인원 관리 및 폭설 시 재설 지원으로 지역 생활환경 보호
  • 지역사회 협력: 정기적 주민 협의체 운영으로 민원을 선제적으로 해소하고 신뢰 기반 구축
안전관리자 추가 배치 법적 기준 초과 안전관리자 자율 배치
G

책임기반 품질 관리 체계 적용

  • 본사 지원 체계: 건축·개발사업본부와 안전보건팀의 적극적 지원으로 현장-본사 협력 거버넌스 구현
  • 품질관리 내재화: 공정 간섭 최소화 일정 운영·전문 인력 적정 배치로 전 공정 품질 기준 준수
  • 협력사 상생 및 투명한 운영: 협력사와의 유연한 공정 조율로 책임 있는 공급망 관리 실천
30개월 공사 기간 무재해 완주

연계 SDGs 세부목표

11.6 대기의 질과 지자체 등의 폐기물 특별 관리를 포함하여, 2030년까지 도시화로 인한 부정적인 환경영향을 감소

안전한 주거환경과 녹지 공간 조성을 통해 도시 생활환경 개선에 기여하며, 공사 과정의 환경영향 최소화를 통해 도시 지속가능성 제고

SDG 11 지속가능한 도시와 공동체